Product Description
(F) Porsche 911 - Full cage 6pt
$5,800.00 inc. gst
(B) Alfa 147 - Full cage 6pt - Bolt-in
$2,200.00 inc. gst
$1,450.00 inc. gst
Half Cage (4 point) Bolt-in – Main Hoop, single diagonal brace (through hoop), back stays and harness bar (no eye bolts).
- Entry Level specification – Super Sprints or Track Days
Categories: Alfa, Alfa 147, Bolt-in, CAMS Roll Cages
Description
Current Lead Times
Description
Notes:
- AGI Bolt-in roll cage kits are painted in a Satin Black (low glare) finish.
- Roll cage kits come complete with lower plates and high tensile fasteners.
- Roll Cage tubing is Motorsport Australia (CAMS) compliant 350 MPA CDS Mild Steel. MIG Welded.
- Motorsport Australia (CAMS) Roll Cage registration documentation is provided with completed roll cage kit. Please advise your vehicle VIN / chassis number when the build is complete so that we can complete the necessary Motorsport Australia (CAMS) paperwork.
- Please note that the regulations have changed for Motorsport Australia (CAMS) approved roll cages from JAN 2012. Additional bar work is required at a National level while some existing roll cage coupling designs have now been outlawed. Our 2015 spec roll cage kits meet the new requirements.
- If you’re intending to fit the kit yourself, please note that all our bolt-in roll cages are pre-drilled (roll cage connector to corresponding tube) unlike some kits on the market. We also check for accuracy and fitment on our in-house roll cage jig (see attached photo). If you’re comparing our roll cages to that of a rival product, please make sure your comparing like for like. Some bolt-in kits are not CAMS compliant while other kits don’t simply ‘bolt-in’ as suggested and require days of modification to install.
- Please note that payment in full (for the roll cage kit) is required when ordering. Fitment or freight can be invoiced upon completion if preferred.
- An Electronic Bank Transfer (EFT) for payment is preferred although we can also take a credit card payment over the phone.
CAMS spec – BOLT-IN - Roll cage kit – Lead times (Jan 2021)
Currently taking orders for March 2021
Please advise us if you’re competing within the time frame listed above so we can look to have your cage ready a little earlier so you don’t miss your first event.